Tuesday, December 20, 2011
Lower the Drawbridge!
Friday, June 3, 2011
Recycling a Module
It will just work although there will be a 550 millimetre (approx. 21.5 inches) radius curve on the module behind it in the above pic. The cutting there will be deeper and have the timber bridge in about the spot where it can be seen above. The cutting and bridge will help disguise the sharp curve which will be the sharpest by far on the layout. Testing with my longest passenger coaches was successful, they will just make it around the curve without the ends clashing. None of my locomotives should present a problem.
I'm pleased that I can reuse this module, it's one less that I have to build and saves a nice bit of basic scenery. The track laid in the cutting is laid to "pioneer line" standards ie. straight in the dirt with no ballast. Now that it will form part of the mainline, it will have to be taken up and relaid in ballast to mainline standards.
Only two more modules and a hinged liftup section to be built. I've arranged to take a week off work in about two weeks so hopefully during that time all benchwork will be complete and trains can be run again.
Watch this space!